Garage Floor Coatings in Oklahoma City — Done in One Day

Flat $8 per square foot. All-inclusive. No salesman in your living room.

One-day install Park on it in 24 hours Family-owned, OKC metro
No estimate visit. No games.
$8 / SQ FT.That's the whole price.

What's included

  • Full surface prep and diamond grinding
  • Crack and chip repair
  • Moisture testing on every slab
  • Premium polyurea base coat
  • Decorative flake in your choice of color
  • UV-stable polyaspartic topcoat
  • Full cleanup
Honest about the one variable

Standard slabs. If your concrete needs moisture-barrier treatment, we tell you the exact added cost before you commit — never after.

Why we just post the price

Most companies make you book an in-home estimate so a commission salesman can size you up. We just tell you the price.

$4,000
Typical 2-car
500 sq ft
$5,600
Typical 3-car
700 sq ft
Get My Exact Quote
Start to finish in one day

Our 6-step process

STEP 1

Moisture Test

STEP 2

Grind

STEP 3

Repair

STEP 4

Base Coat

STEP 5

Flake Broadcast

STEP 6

Polyaspartic Topcoat

Walk on it tonight. Park on it in 24 hours.

Objection, handled

Why one day actually works

Old epoxy floors take 3–4 days because the chemistry is slow — not because slow means better. We use polyurea and polyaspartic. It's a stronger coating that cures fast because the chemistry is better, not because corners get cut.

  • 1
    Stronger bond than epoxy — built for hot tires and dropped tools.
  • 2
    UV-stable. It never yellows, even by a garage door that gets afternoon sun.
  • 3
    Fast cure by chemistry, not shortcuts. Done right, in a day.
  • 4
    Every slab gets a moisture test first. If your concrete isn't a candidate, we say so.
Old 3–4 Day Epoxy
Okie Polyurea
Yellows in sunlight
UV-stable, stays true
Peels from hot tires
Holds against hot tires
Multi-day downtime
One day, park in 24 hrs
Slower, weaker cure
Stronger, faster cure
Pick your look

Flake colors

Red Dirt
Charcoal, tan & burnt orange
Storm Gray
Slate, silver & white
Wheat Field
Tan, brown & cream
Blacktop
Black, gray & white
Sooner Slate
Blue-gray, tan & white
Bricktown
Rust, cream & brown
Prairie Smoke
Gray, taupe & bone
Timber Green
Forest, tan & black
See a color you like? Lock in your install date

Family photo
coming soon
The anti-franchise

Meet the family

We're the Grellners — Josh and family, with roots in Okarche and a shop in the OKC metro. Okie Coatings is locally owned. When you call, you get us. When we grind your floor, that's us too.

A franchise can copy a price. It can't copy real names and real faces who live down the road and put their family name on your garage. That's the whole reason we started this.

Meet the team
From your neighbors

Reviews

★★★★★

Google reviews load here.

We launched in 2026. Real reviews from real OKC-metro customers go here as they come in — we don't write our own.

Referral program

The easiest $200 in Oklahoma

$200

Refer a neighbor and get $200 when their floor goes in. No limit. Tell your whole street.

Refer a Neighbor
Straight answers

Frequently asked

Polyurea and polyaspartic cure far faster than old epoxy — it's better chemistry, not cut corners. We grind, repair, base coat, broadcast flake, and topcoat in a single day. You walk on it that night and park on it in 24 hours.
Cracks and chips are repaired as part of the flat $8 — that's included. Moisture is the one variable: every slab gets a moisture test first. If yours needs moisture-barrier treatment, we tell you the exact added cost before you commit, never after. And if the concrete isn't a good candidate at all, we'll tell you that too.
The flat $8/sq ft covers standard slabs end to end — prep, grinding, crack and chip repair, moisture testing, polyurea base, flake, polyaspartic topcoat, and cleanup. The only thing that can add cost is moisture-barrier treatment on a slab that tests for it, and you'll see that exact number up front.
Walk on it the same night. Park on it in 24 hours. The polyaspartic topcoat is what lets you get back to normal that fast.
The garage needs to be empty for us to do it right. We arrange a local moving/POD partner at booking so you're not stuck hauling everything yourself — just ask when we set your date.
No. Hot-tire peel is an epoxy problem — hot rubber pulls weakly-bonded epoxy right off the slab. Polyurea bonds far more aggressively to the concrete and stays flexible, so hot tires don't lift it. That's a big reason we don't use epoxy.
Speed-to-lead

Get your exact quote by text in under 5 minutes

Tell us your garage size and we'll text you back fast — no in-home sales visit, no pressure.

  • Flat $8/sq ft, all-inclusive
  • One-day install, park in 24 hours
  • Family-owned in the OKC metro

Prefer to talk? Call (405) 555-0142

Got it! We'll text your exact quote shortly. Watch for a message from (405) 555-0142.

No spam. No in-home sales visit. We just text you the price.

Call Now — (405) 555-0142